Site visit details

Overview

Catchment Goulburn River
Site Sugarloaf Creek at ford in Ashes Bridge Road GB_SUG020
Date and Time Wednesday 21st March 2018 13:15pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm rP mg/L P Air ° C Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 750 7.3 0 19.5 29
Weather
Last rainfall
Flow estimate POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants bottles

Level dropped - no flow through culvert under road. Disconnected pools.

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au