Site visit details

Overview

Catchment Ovens River
Site Ovens River East Branch Bon Accord Track, Harrietville NE_OVE004
Date and Time Monday 26th March 2018 13:30pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Water ° C Turb NTU
Sample 77.6 7.62 0.023 11.9 9
Weather overcast
Last rainfall During the last week 55.00
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants

Dissolved oxygen chemicals clearing quickly.  In the past has required considerable agitation to dissolve all particles.  Soaking rain but little runoff.

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au