Site visit details

Overview

Catchment Barwon River
Site David St Stormwater drain, The Esplanade, Indented Head CO_IND009
Date and Time Sunday 13th May 2018 10:30am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 45 4.5 8 0 15 14 10
Weather cloudy
Last rainfall During the last week 40.00
Flow estimate STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected)
Water Appearance Clear
Stream depth
Stream width
Hazards
Litter/Pollutants

Drain open to the sea 3 days prior

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au