Site visit details

Overview

Catchment Bunyip River
Site Cannibal Creek at Wimpole Rd, Garfield North ME_ECN500
Date and Time Wednesday 7th March 2012 11:33am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 280 0.07 15 15 10
Weather cloudy
Last rainfall During the last 24 hours
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance
Stream depth 51cm - 99cm
Stream width >5m
Hazards
Litter/Pollutants
pH: hanna tester not working, flat battery parameters not tested: dissolved oxygen, ammonium, nitrate There is no longer a side stream running parallel to the road Over the past 3 days we have had 25 mm of rain N.B missed doing the testing on 7/12/11 (spring)

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au