Site visit details

Overview

Catchment Barwon River
Site David St Stormwater drain, The Esplanade, Indented Head CO_IND009
Date and Time Saturday 10th March 2018 11:00am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 27 2.1 8.5 0.11 23 22 10
Weather sunny
Last rainfall More than a week ago
Flow estimate POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance Scummy
Stream depth
Stream width
Hazards
Litter/Pollutants

EC over range

Drain opended to the bay the day peior to scheduled monitoring. Water basically sea water.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au