Waterwatch Data Portal
CO_IND009 David St Stormwater drain, The Esplanade, Indented Head
10 March 2018
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | David St Stormwater drain, The Esplanade, Indented Head CO_IND009 |
Date and Time | Saturday 10th March 2018 11:00am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 27 | 2.1 | 8.5 | 0.11 | 23 | 22 | 10 |
Weather | sunny |
---|---|
Last rainfall | More than a week ago |
Flow estimate | POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected) |
Water Appearance | Scummy |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
EC over range
Drain opended to the bay the day peior to scheduled monitoring. Water basically sea water.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au