Waterwatch Data Portal
ME_YFM980 Five Mile Creek, end of Governors Road, Essendon
7 July 2018
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Five Mile Creek, end of Governors Road, Essendon ME_YFM980 |
Date and Time | Saturday 7th July 2018 14:00pm |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 9 | 0.07 | 14.4 | 13.4 |
Weather | windy |
---|---|
Last rainfall | During the last 24 hours 2.00 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | < 2m |
Hazards | Slope |
Litter/Pollutants |
Kit needs:
- Alcohol to clean EC probe (necessary?)
- Turbidity tube
- Batteries for ECTestr11+�
- Calibration solutions
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au