Site visit details

Overview

Catchment Yarra River
Site Five Mile Creek, end of Governors Road, Essendon ME_YFM980
Date and Time Saturday 7th July 2018 14:00pm
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 9 0.07 14.4 13.4
Weather windy
Last rainfall During the last 24 hours 2.00
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 0 - 50cm
Stream width < 2m
Hazards Slope
Litter/Pollutants

Kit needs:

- Alcohol to clean EC probe (necessary?)

- Turbidity tube

- Batteries for ECTestr11+�

- Calibration solutions

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au