Waterwatch Data Portal
ME_YGR023 Blackburn Lake at Heron Point opposite Naughton Gve Blackburn
4 June 2017
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Blackburn Lake at Heron Point opposite Naughton Gve Blackburn ME_YGR023 |
Date and Time | Sunday 4th June 2017 11:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.07 | 53.8 | 6 | 110 | 6.4 | 0.003 | 8 | 10.5 | 12 |
Weather | overcast |
---|---|
Last rainfall | During the last week 15.00 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | |
Stream depth | 1m - 2m |
Stream width | |
Hazards | |
Litter/Pollutants |
SD, JB, JS, TP, EB, AP
Poplars totally bare
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au