Waterwatch Data Portal
ME_YGR006 Gardiners Creek upstream of Blackburn Lake, at Pobblebonk point, adjacent to Vegemite Creek
8 April 2018
Overview
Catchment | Yarra River |
---|---|
Site | Gardiners Creek upstream of Blackburn Lake, at Pobblebonk point, adjacent to Vegemite Creek ME_YGR006 |
Date and Time | Sunday 8th April 2018 10:15am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Rain mm | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.04 | 9.66 | 0.9 | 6.8 | 0.09 | 20 | 18.8 | 22 |
Weather | sunny |
---|---|
Last rainfall | More than a week ago |
Flow estimate | STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected) |
Water Appearance | |
Stream depth | 1m - 2m |
Stream width | |
Hazards | |
Litter/Pollutants | bottles |
Monitors: Su Dempsy, Sue W., John Shortridge, Elaine Boucher, Stephanie E, Tanveer Alvi
- DO% saturation incorrect as Electrical Conductivity of water was not measured (the EC meter died - tried new batteries but didn't work). Have entered a random value to avoid error on submitting the data.
- Ammonium score degraded due to sewage spill extending from Billabong bridge into the lake.
- Monthly test delayed due to sewer spill - March - April
- Water very discoloured - almost black, smelly and still due to the sewage spill.
- No water in Vegemite Creek (one of the feeder creeks that enters the lake at Pobblebonk point)
- 2 female chestnut teals, 1 coot
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au