Site visit details

Overview

Catchment Yarra River
Site Gardiners Creek upstream of Blackburn Lake, at Pobblebonk point, adjacent to Vegemite Creek ME_YGR006
Date and Time Sunday 8th April 2018 10:15am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Rain mm rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.04 9.66 0.9 6.8 0.09 20 18.8 22
Weather sunny
Last rainfall More than a week ago
Flow estimate STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected)
Water Appearance
Stream depth 1m - 2m
Stream width
Hazards
Litter/Pollutants bottles

Monitors: Su Dempsy, Sue W., John Shortridge, Elaine Boucher, Stephanie E, Tanveer Alvi

- DO% saturation incorrect as Electrical Conductivity of water was not measured (the EC meter died - tried new batteries but didn't work). Have entered a random value to avoid error on submitting the data.

- Ammonium score degraded due to sewage spill extending from Billabong bridge into the lake.

- Monthly test delayed due to sewer spill - March - April

- Water very discoloured - almost black, smelly and still due to the sewage spill.

- No water in Vegemite Creek (one of the feeder creeks that enters the lake at Pobblebonk point)

- 2 female chestnut teals, 1 coot

 

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au