Waterwatch Data Portal
ME_YGR020 Blackburn Lake at the Landing, a constructed platform on the edge of the lake
3 June 2018
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Blackburn Lake at the Landing, a constructed platform on the edge of the lake ME_YGR020 |
Date and Time | Sunday 3rd June 2018 10:15am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.07 | 120 | 6.5 | 0.03 | 8 | 12.5 | 13 |
Weather | overcast |
---|---|
Last rainfall | During the last week 7.40 |
Flow estimate | STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected) |
Water Appearance | Other |
Stream depth | 1m - 2m |
Stream width | |
Hazards | |
Litter/Pollutants | bottles,packets,other: 2 cigarette butts |
Monitors: Su Dempsy, John Shortridge, Anne Payne, Elaine Boucher
- Dissolved oxygen incorrect, entered random value to avoid error on submitting data. Colorimeter was not working. Further tests done later when batteries were replaced. RA - removed oxygen parameters
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au