Waterwatch Data Portal
CO_SWA140 Lake Victoria @ Hollywood Estate, (Emily St wetlands)
13 September 2018
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Lake Victoria @ Hollywood Estate, (Emily St wetlands) CO_SWA140 |
Date and Time | Thursday 13th September 2018 11:05am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | Nitrate-Nit mg/L N | Nitr mg/L | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 116.8 | 11.2 | 5610 | 8.6 | 0.015 | 18 | 16.5 | 3 |
Weather | sunny |
---|---|
Last rainfall | During the last week 6.00 |
Flow estimate | PERMANENT: wetlands and lakes |
Water Appearance | |
Stream depth | 51cm - 99cm |
Stream width | > 5m |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au