Waterwatch Data Portal
ME_YGR020 Blackburn Lake at the Landing, a constructed platform on the edge of the lake
7 October 2018
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Blackburn Lake at the Landing, a constructed platform on the edge of the lake ME_YGR020 |
Date and Time | Sunday 7th October 2018 10:30am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 101.45 | 9.8 | 165 | 7.1 | 0.04 | 20 | 17 | 16 |
Weather | sunny |
---|---|
Last rainfall | More than a week ago |
Flow estimate | STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected) |
Water Appearance | Stained brown |
Stream depth | 51cm - 99cm |
Stream width | |
Hazards | |
Litter/Pollutants |
Monitors: Elaine B., John S., Wira Y., Amber, Tanveer A.
Birds: 2 Pacific Black Duck, 1 Coot
Note: Powder reagent for Phosphate test was added using the new (white) spoon which is a bit larger than the older spoon. Phosphate reading is higher compared to previous tests.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au