Site visit details

Overview

Catchment Upper Murray River
Site Nariel Creek, Benambra-Corryong Road, Nankervis Bridge NE_NAR065
Date and Time Sunday 16th September 2018 13:25pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Water ° C P mg/L Turb FTU Turb NTU
Sample 98.8022 11.2 155 7.8 9.8 0.09 10
Weather overcast
Last rainfall During the last 24 hours 3.00
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au