Site visit details

Overview

Catchment Upper Murray River
Site Nariel Creek, Benambra-Corryong Road, Nankervis Bridge NE_NAR065
Date and Time Thursday 25th October 2018 11:30am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Water ° C P mg/L Turb FTU Turb NTU
Sample 101.574 10 148 7.02 16.1 0.046 10
Weather sunny
Last rainfall During the last week 15.00
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth
Stream width
Hazards
Litter/Pollutants

Habitat

Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Fair 3 Poor 4 Poor 4 Poor 2 Poor 4 17

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au