Waterwatch Data Portal
CO_IND009 David St Stormwater drain, The Esplanade, Indented Head
29 September 2018
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | David St Stormwater drain, The Esplanade, Indented Head CO_IND009 |
Date and Time | Saturday 29th September 2018 09:15am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 6.4 | 8 | 0.11 | 8.5 | 10 | 10 |
Weather | cloudy |
---|---|
Last rainfall | During the last 24 hours |
Flow estimate | POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected) |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | other: cigarette butt |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au