Site visit details

Overview

Catchment Barwon River
Site Dewings Creek CO_DEW010
Date and Time Friday 7th December 2018 12:15pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C P mg/L Turb FTU Turb NTU
Sample 63.84 5.8 259 7.2 0.015 28 20 15
Weather sunny
Last rainfall During the last week
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Stained brown,Muddy
Stream depth 51cm - 99cm
Stream width < 2m
Hazards
Litter/Pollutants

tested by Craig & Bernie

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au