Site visit details

Overview

Catchment Yarra River
Site Mullum Mullum Creek @ Quarry Road ME_YML046
Date and Time Tuesday 22nd January 2019 10:00am
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm Nitrate mg/L pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 59.49 5.1 200 0 7.1 0.01 25 23 9
Weather sunny
Last rainfall More than a week ago 0.00
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth
Stream width
Hazards
Litter/Pollutants bottles,paper,plastic,waxed cardboard,cans

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au