Site visit details

Overview

Catchment Bunyip River
Site Tanti Creek at Stones Crossing ME_ETN600
Date and Time Saturday 30th March 2019 08:40am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FAU Turb NTU
Sample 0.04 77.35 7.7 692 6.8 0.14 10.8 15.5 33.76
Weather overcast
Last rainfall During the last 24 hours 5.00
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance Muddy
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants bottles,cans

Analysis undertaken to test water quality after first rain for some weeks.  Rainfall has been light showers over last 24 hrs for total 5mm.

Analysis shows elevated turbidity and phosphate levels

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au