Waterwatch Data Portal
ME_MDT010 Tributary of Deep Creek @ Newham Primary School
4 April 2019
Site visit details
Overview
Catchment | Maribyrnong River |
---|---|
Site | Tributary of Deep Creek @ Newham Primary School ME_MDT010 |
Date and Time | Thursday 4th April 2019 15:30pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 74.07 | 7 | 560 | 9 | 0 | 21 | 18 | 40 |
Weather | cloudy |
---|---|
Last rainfall | During the last week 1.00 |
Flow estimate | POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected) |
Water Appearance | Stained green |
Stream depth | 0 - 50cm |
Stream width | |
Hazards | |
Litter/Pollutants |
The water level was MUCH lower than last measurement a month ago. Thick green scum (presumably algae) covered the entired surface.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au