Site visit details

Overview

Catchment Ovens River
Site One Mile Creek - North of Roy St W NE_ONE025
Date and Time Monday 20th May 2019 09:59am
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 105 6 0.02 13.6 12 50
Weather
Last rainfall 1
Flow estimate STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected)
Water Appearance Scummy,Smelly,Stained brown,Muddy,Oily
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants bottles,plastic,cans,packets,polystyrene

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au