Site visit details

Overview

Catchment Yarra River
Site Five Mile Creek, end of Governors Road, Essendon ME_YFM980
Date and Time Saturday 4th May 2019 12:20pm
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 49.6131 5 190 6.9 0.09 16 15 27
Weather raining
Last rainfall During the last week 8.00
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Milky
Stream depth 0 - 50cm
Stream width < 2m
Hazards
Litter/Pollutants bottles,plastic,cans,packets

Rained two days ago. Water level dropped back to normal but lots of trash washed in.

 

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au