Site visit details

Overview

Catchment Yarra River
Site Blackburn Lake at Heron Point opposite Naughton Gve Blackburn ME_YGR023
Date and Time Sunday 5th May 2019 11:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.15 41.67 4.2 139 6.7 0.01 15 15 20
Weather overcast
Last rainfall During the last week 0.00
Flow estimate STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected)
Water Appearance Stained brown
Stream depth 1m - 2m
Stream width
Hazards
Litter/Pollutants plastic

Monitors: John Shortridge, Su Dempsy, Elaine Boucher, Wira Yan, Alfoncina

What has changed: Poplars on dam wall in full autumn colours, will be dropping into lake soon.

What stands out: Very clean, no debries on lake here or around verges.

Note: The sample was taken from a depth of more than 50cm, which gave unsual results for some tests. Hence, a second sample was taken (at a depth of around 30cm, as is usually done) and the results for DO, Ammonium and Phosphate tests are that of the second sample.
[Readings with the first sample were:
DO - 1.7 -> 17%
Phosphate - .03
Ammonium - very deep green - almost outside range]

 

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au