Site visit details

Overview

Catchment Goulburn River
Site Mudbridge at Tahbilk Wetlands GB_WTB002
Date and Time Wednesday 31st October 2018 09:35am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units Rain mm Air ° C Water ° C Turb NTU
Sample 69.71 6.3 62.2 7 20.7 20.3 22.9
Weather
Last rainfall
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au