Site visit details

Overview

Catchment Yarra River
Site Gardiners Creek upstream of Blackburn Lake, at Pobblebonk point, adjacent to Vegemite Creek ME_YGR006
Date and Time Sunday 20th January 2019 15:00pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Rain mm rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0 38.23 3.1 196 7.8 0 26 26 44
Weather sunny
Last rainfall During the last week
Flow estimate
Water Appearance Scummy
Stream depth
Stream width
Hazards
Litter/Pollutants

Monitor: Su Dempsy

These tests were done 2-3 days after a Shampoo Spill event. The water was scummy with lots of bubbles but there was no foam.

Tests were done at another upstream spot, results are in the attached sheet.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au