Waterwatch Data Portal
ME_YGR020 Blackburn Lake at the Landing, a constructed platform on the edge of the lake
20 January 2019
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Blackburn Lake at the Landing, a constructed platform on the edge of the lake ME_YGR020 |
Date and Time | Sunday 20th January 2019 14:00pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 33.29 | 2.7 | 123 | 7.8 | 0 | 26 | 26 | 23 |
Weather | sunny |
---|---|
Last rainfall | During the last week |
Flow estimate | |
Water Appearance | Clear,Stained brown |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Monitor: Su Dempsy
These tests were done 2-3 days after a Shampoo Spill event.
Tests were also done at a point upstream Pobblebonk point. Details are in the attached data sheet
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au