Waterwatch Data Portal
ME_YGR023 Blackburn Lake at Heron Point opposite Naughton Gve Blackburn
20 January 2019
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Blackburn Lake at Heron Point opposite Naughton Gve Blackburn ME_YGR023 |
Date and Time | Sunday 20th January 2019 13:30pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.1 | 54.48 | 4.5 | 164 | 7.8 | 0.004 | 25 | 25 | 34 |
Weather | sunny |
---|---|
Last rainfall | During the last week |
Flow estimate | |
Water Appearance | Stained brown |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Monitor: Su Dempsy
These tests were done after a Shampoo Spill event. Tests were also done at a site upstream of Pobblebonk Point. Details are in the attached data sheet.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au