Site visit details

Overview

Catchment Yarra River
Site Blackburn Lake at Heron Point opposite Naughton Gve Blackburn ME_YGR023
Date and Time Sunday 20th January 2019 13:30pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.1 54.48 4.5 164 7.8 0.004 25 25 34
Weather sunny
Last rainfall During the last week
Flow estimate
Water Appearance Stained brown
Stream depth
Stream width
Hazards
Litter/Pollutants

Monitor: Su Dempsy

These tests were done after a Shampoo Spill event. Tests were also done at a site upstream of Pobblebonk Point. Details are in the attached data sheet.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au