Site visit details

Overview

Catchment Lake Colac
Site Barangarook Creek @ Murray St CO_BRO023
Date and Time Thursday 14th February 2019 13:23pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 70 1486 7 15.7 11.5
Weather
Last rainfall During the last 24 hours
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants

VEC Barongarook results

pH lower than expected. No activities on site that could compromise WQ. Turbidity was reduced. Rain in the previous 2 to 4 hr appeared to influence the creek, reduced EC, turbidity and pH.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au