Waterwatch Data Portal
ME_YML047 Mullum Mullum Creek at Tandarook Crescent, Donvale
15 October 2019
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Mullum Mullum Creek at Tandarook Crescent, Donvale ME_YML047 |
Date and Time | Tuesday 15th October 2019 14:15pm |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | Nitrate mg/L | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.02 | 101.46 | 9.4 | 410 | 1.019 | 6.9 | 0.036 | 20 | 19 | 10 |
Weather | sunny |
---|---|
Last rainfall | During the last week 0.00 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants | bottles,paper,plastic,cans |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au