Site visit details

Overview

Catchment Yarra River
Site Glen Waverley Main Drain. Behind 5/6 Crosby Drive, Glen Waverley ME_YSC012
Date and Time Sunday 20th October 2019 10:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0 200 7 11.5 12 21
Weather cloudy
Last rainfall During the last week 11.00
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear,Muddy
Stream depth 0 - 50cm
Stream width < 2m
Hazards
Litter/Pollutants bottles,plastic,polystyrene

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au