Waterwatch Data Portal
ME_EBI200 Bittern catch drain, 20m above Devilbend Creek
27 August 2019
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Bittern catch drain, 20m above Devilbend Creek ME_EBI200 |
Date and Time | Tuesday 27th August 2019 11:00am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 76.6 | 8 | 1360 | 8.5 | 0 | 12 | 13.2 | 20 |
Weather | cloudy |
---|---|
Last rainfall | During the last 24 hours 8.00 |
Flow estimate | BANKFULL: High flow within channel capacity and in-stream habitats connected |
Water Appearance | Muddy |
Stream depth | 0 - 50cm |
Stream width | > 5m |
Hazards | none . normal caution required |
Litter/Pollutants |
water level very high flooding in some parts. very muddy. water overflowing wall at diversion pipe and catch drain nearly flooding
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au