Site visit details

Overview

Catchment Bunyip River
Site Bittern catch drain, 20m above Devilbend Creek ME_EBI200
Date and Time Tuesday 27th August 2019 11:00am
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 76.6 8 1360 8.5 0 12 13.2 20
Weather cloudy
Last rainfall During the last 24 hours 8.00
Flow estimate BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance Muddy
Stream depth 0 - 50cm
Stream width > 5m
Hazards none . normal caution required
Litter/Pollutants

water level very high flooding in some parts. very muddy. water overflowing wall at diversion pipe and catch drain nearly flooding

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au