Site visit details

Overview

Catchment Bunyip River
Site Bittern Dam, near dam wall and catch drain ME_EBI100
Date and Time Tuesday 27th August 2019 10:30am
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 76.13 8 1560 8.9 0.01 14 12.9 9
Weather cloudy
Last rainfall During the last 24 hours 10.00
Flow estimate BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance Clear
Stream depth 51cm - 99cm
Stream width > 5m
Hazards none . normal caution required
Litter/Pollutants

no rubbish at this site. water green and slimy at edge. not many water birds

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au