Site visit details

Overview

Catchment Ovens River
Site Happy Valley Creek, Rosewhite Site 8 NE_HPV080
Date and Time Monday 28th October 2019 16:00pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N Nitr mg/L pH pH Units rP mg/L P Water ° C P mg/L Turb FTU Turb NTU
Sample 109.9 10.34 100 0.04 20.3 9
Weather sunny
Last rainfall During the last week
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance
Stream depth 51cm - 99cm
Stream width 2m - 5m
Hazards
Litter/Pollutants

pH high??? Recalibrated and repeated but same result. Sample from Site 9 collected/tested on same day had more typical result.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au