Site visit details

Overview

Catchment Campaspe River
Site Campaspe River Crossing (Hodges Bridge), Boundary Road, Greenhill NC_CAM200
Date and Time Sunday 12th January 2020 11:30am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 44 4.3 325 0.2 20 17 9
Weather sunny
Last rainfall During the last week 3.50
Flow estimate POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance Clear
Stream depth
Stream width > 5m
Hazards
Litter/Pollutants

River at Hodge's Bridge is now completely dry so relocated sampling to the Black hole.

Dissolved Oxygen 4.3 mg/L

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au