Site visit details

Overview

Catchment Goulburn River
Site Creightons Creek d/s of Threlful Creek GB_CRE003
Date and Time Sunday 16th February 2020 12:00pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm rP mg/L P Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 150 7 0 18 13
Weather cloudy
Last rainfall During the last week 3.00
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth
Stream width
Hazards
Litter/Pollutants

Ec same as Jan

 Turbidity < Jan

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au