Site visit details

Overview

Catchment Bunyip River
Site Bittern Dam, near dam wall and catch drain ME_EBI100
Date and Time Tuesday 18th February 2020 10:50am
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 96.94 8.5 3500 8.7 0 22 21.3 9
Weather cloudy
Last rainfall Raining now 5.00
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 1m - 2m
Stream width > 5m
Hazards none . normal caution required
Litter/Pollutants cans

2x beer cans. indication of a campfire.some water birds but not in large numbers

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au