Site visit details

Overview

Catchment Yarra River
Site Findon Creek, before joining with Darebin Creek, crossing over Hayston Boulevard, Epping North ME_YFI300
Date and Time Thursday 27th February 2020 05:50am
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 81 7 581 7.1 0.02 20 21.1 19
Weather cloudy
Last rainfall During the last week 6.00
Flow estimate STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected)
Water Appearance Clear
Stream depth 1m - 2m
Stream width > 5m
Hazards
Litter/Pollutants

First sampling session with new WW group. 3 in attendance supervised by Ww Coord Julia Cirillo

Creek banks and in-stream was very silty. Large piles of "fill" left on banks upstream and downstream of this site.

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au