Waterwatch Data Portal
ME_YFI300 Findon Creek, before joining with Darebin Creek, crossing over Hayston Boulevard, Epping North
27 February 2020
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Findon Creek, before joining with Darebin Creek, crossing over Hayston Boulevard, Epping North ME_YFI300 |
Date and Time | Thursday 27th February 2020 05:50am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 81 | 7 | 581 | 7.1 | 0.02 | 20 | 21.1 | 19 |
Weather | cloudy |
---|---|
Last rainfall | During the last week 6.00 |
Flow estimate | STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | 1m - 2m |
Stream width | > 5m |
Hazards | |
Litter/Pollutants |
First sampling session with new WW group. 3 in attendance supervised by Ww Coord Julia Cirillo
Creek banks and in-stream was very silty. Large piles of "fill" left on banks upstream and downstream of this site.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au