Site visit details

Overview

Catchment Broken River
Site Lima East Creek at Swanpool-Lima Road GB_LEC009
Date and Time Sunday 6th October 2019 14:30pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units Rain mm Water ° C Turb NTU
Sample 80 7.1 1 19.1 10
Weather sunny
Last rainfall During the last 24 hours 1.00
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Stained brown
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au