Site visit details

Overview

Catchment Yarra River
Site Westgate Park- Saltwater Lake (near Todd Road), Port Melbourne ME_YWP001
Date and Time Saturday 18th January 2020 09:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 8 8.9 19.8 22.2 300
Weather sunny
Last rainfall During the last week 30.00
Flow estimate
Water Appearance Other
Stream depth Other:0.3 m
Stream width
Hazards
Litter/Pollutants

Water level dropped even though there was a large rainfall event. Lake is turning pink, brown/clear colour on surface possibly from recent rainfall.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au