Waterwatch Data Portal
ME_YFI300 Findon Creek, before joining with Darebin Creek, crossing over Hayston Boulevard, Epping North
3 June 2020
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Findon Creek, before joining with Darebin Creek, crossing over Hayston Boulevard, Epping North ME_YFI300 |
Date and Time | Wednesday 3rd June 2020 16:00pm |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 64.99 | 7 | 883 | 7.6 | 0.1 | 13.2 | 11.9 | 31 |
Weather | cloudy |
---|---|
Last rainfall | During the last 24 hours |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Muddy |
Stream depth | 51cm - 99cm |
Stream width | > 5m |
Hazards | |
Litter/Pollutants |
Park area surrounding creek is mostly litter free. Still has the large piles of dirt by the banks of the creek with a fence around them, it has been here at least since Feb 2020.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au