Site visit details

Overview

Catchment Upper Murray River
Site Nariel Creek, Benambra-Corryong Road, Nankervis Bridge NE_NAR065
Date and Time Sunday 23rd February 2020 11:00am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Water ° C P mg/L Turb FTU Turb NTU
Sample 79.68 7.2 90 8.27 0.083 20.3 60
Weather sunny
Last rainfall
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance Stained brown
Stream depth
Stream width
Hazards
Litter/Pollutants

 Fast flowing creek, brown water. Silty sandbar in the middle. Some charcoal floating

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au