Site visit details

Overview

Catchment Bunyip River
Site Main Creek at the Noxon property ME_EMI100
Date and Time Monday 29th March 2010 09:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 63.54 6 1500 6.7 0.03 20 17.9 10
Weather overcast
Last rainfall During the last 24 hours 12.00
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Oily
Stream depth Other:12 cm
Stream width Other:1 m
Hazards
Litter/Pollutants

Dissolved O2 % calculated: 0.95

Conductivity measured in μS/cm3

Water appeared to have an oily skin 

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au