Site visit details

Overview

Catchment Bunyip River
Site Main Creek at the Noxon property ME_EMI100
Date and Time Monday 27th August 2012 08:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 64.51 7 695 0 0.05 12 11.6 10
Weather sunny
Last rainfall During the last week 0.00
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Foamy/frothy
Stream depth Other:35 cm
Stream width Other:1.3 m
Hazards
Litter/Pollutants

Faulty probe on conductivity meter

Dissolved O%: 0.81

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au