Site visit details

Overview

Catchment Bunyip River
Site Main Creek at Shands Rd crossing ME_EMI150
Date and Time Tuesday 29th November 2011 11:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.08 98.02 9 746 8.2 0.05 23 19.4 10
Weather overcast
Last rainfall During the last week 0.00
Flow estimate BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance Clear
Stream depth Other:33 cm
Stream width Other:1.5 m
Hazards
Litter/Pollutants

Water temp at DO test: 25.3

Began measuring DO using temp at time of test.

Recent heavy rain

Dissolved O%: 1.5

 

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au