Site visit details

Overview

Catchment Barwon River
Site Barwon River @ McFarlanes Lane Winchelsea CO_BAR062
Date and Time Tuesday 1st September 2020 12:00pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L eDNA presence=1 EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 1165 6.5
Weather
Last rainfall
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants

HI bit better than last month, still poor for August September.

We had 10 days of high and medium height and very fast flow. The EC dropped to 460 for 2 days, then to 850 for a week and today as below.

Date 1/09/2020

From Top of Bank 2.5

Flow slow

PH 6.5

Ec/ mS 1165

Appearance Dark

 

 

 

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au