Site visit details

Overview

Catchment Yarra River
Site Findon Creek, before joining with Darebin Creek, crossing over Hayston Boulevard, Epping North ME_YFI300
Date and Time Tuesday 21st July 2020 15:45pm
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.02 55.35 6 1720 8 0.07 11.5 11.5 11
Weather cloudy
Last rainfall During the last 24 hours 0.00
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Stained brown
Stream depth 51cm - 99cm
Stream width < 2m
Hazards
Litter/Pollutants plastic,packets,other: Dumped rubbish

Part of the Pesticide Detextives sediment sampling program. 

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au