Waterwatch Data Portal
NC_SPR170 Spring (Gully) Creek - first footbridge downstream from Cricket Oval & playground
26 May 2012
Site visit details
Overview
Catchment | Loddon River |
---|---|
Site | Spring (Gully) Creek - first footbridge downstream from Cricket Oval & playground NC_SPR170 |
Date and Time | Saturday 26th May 2012 14:00pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|
Sample | 120 | 7.3 | 0.1 | 14 | 13 | 30 |
Weather | overcast |
---|---|
Last rainfall | During the last 24 hours 6 |
Flow estimate | POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected) |
Water Appearance | Muddy |
Stream depth | 51cm - 99cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | bottles |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au