Site visit details

Overview

Catchment Broken River
Site Stoney Creek at boundary to Lima Pine Plantation GB_SNY003
Date and Time Monday 8th March 2021 10:40am
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units Rain mm rP mg/L P Air ° C Water ° C P mg/L Turb NTU
Sample 100 6.7 1 16.7 9
Weather cloudy
Last rainfall During the last 24 hours 1.00
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 0 - 50cm
Stream width < 2m
Hazards
Litter/Pollutants

Very low flow

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au