Waterwatch Data Portal
NC_BGO021 Bendigo Creek, end of Elm St Golden Square
30 November 2020
Site visit details
Overview
Catchment | Loddon River |
---|---|
Site | Bendigo Creek, end of Elm St Golden Square NC_BGO021 |
Date and Time | Monday 30th November 2020 16:40pm |
Approved | Approved |
Physical Chemical Tests
D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 3940 | 7.6 | 0.15 | 30 | 26 | 9 |
Weather | sunny |
---|---|
Last rainfall | More than a week ago 20.00 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | < 2m |
Hazards | |
Litter/Pollutants | bottles,paper,plastic,packets |
Cumbungi is closing out the site and a sand/rock bar has formed at the site and split the pool i normally sample from the main channel and it is now filling in with cumbungi.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au