Waterwatch Data Portal
NC_BGO021 Bendigo Creek, end of Elm St Golden Square
26 February 2021
Site visit details
Overview
Catchment | Loddon River |
---|---|
Site | Bendigo Creek, end of Elm St Golden Square NC_BGO021 |
Date and Time | Friday 26th February 2021 17:00pm |
Approved | Approved |
Physical Chemical Tests
D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 3020 | 7.5 | 0.07 | 19 | 21 | 24 |
Weather | sunny |
---|---|
Last rainfall | More than a week ago |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Scummy |
Stream depth | 0 - 50cm |
Stream width | < 2m |
Hazards | |
Litter/Pollutants | bottles,plastic,cans,packets |
SIte completely choked by cumbungi, access not possible, sampling was undertaken 30m upstream.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au