Site visit details

Overview

Catchment Goulburn River
Site Creightons Creek at Bartons Lane GB_CRE011
Date and Time Sunday 20th May 2012 12:00pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units Rain mm Water ° C P mg/L Turb NTU
Sample 150 7.1 7 10
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Rainfall since 15th April ~40mm in April and ~12mm in May 2012 EC lower at all sites Turbidity ~ the same at all sites except CRE002, possibly local disturbance

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au