Waterwatch Data Portal
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Creightons Creek at Bartons Lane GB_CRE011 |
Date and Time | Sunday 20th May 2012 12:00pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | Rain mm | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 150 | 7.1 | 7 | 10 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall since 15th April ~40mm in April and ~12mm in May 2012 EC lower at all sites Turbidity ~ the same at all sites except CRE002, possibly local disturbance
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au