Site visit details

Overview

Catchment Yarra River
Site Glen Waverley Main Drain. Behind 5/6 Crosby Drive, Glen Waverley ME_YSC012
Date and Time Sunday 1st August 2021 10:50am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 350 7.3 10 11 31
Weather sunny
Last rainfall During the last 24 hours 23.00
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Muddy
Stream depth 51cm - 99cm
Stream width < 2m
Hazards
Litter/Pollutants paper,plastic,packets,polystyrene,other: Also disposable gloves.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au